Basketball Court Fencing Installation Sequence
Basketball Court Fencing Installation Sequence
Given the requirements of the basketball court construction drawings or due to price considerations, some customers choose an installation method where the mesh panels are stretched on-site and hung onto the posts and beams.
The correct construction procedure for this installation method is as follows: first fix post A, then fix post B, then install the horizontal beams, and then continue stretching the mesh. After completing this section, proceed to fix post C, stretch the mesh between post B and post C, and so on. When installing the posts, never use pliers to force open the connecting grooves, as this may damage the surface protective coating of the fencing mesh. During the curing period after the cement-stone chip layer is completed, all embedded parts shall be fully installed according to the project requirements. When constructing the first leveling course of the foundation, all embedded parts shall be pre-embedded in accordance with the design drawings.